Twisted Pair Technologies

Complete Data, Conectivity & Voice Solutions.

|

02920 099966

Latest installations

Posted on By

We’ve recently renewed and updated the cat5e network infrastructure for Engineering & Lifting specialist W.Walters Ltd, based in Swansea.

Below shows the completed panel with 40 Cat5e data points 24 new and 18 traced tested and re-numbered in a logical sequence.

Cat5 After Installation

Before they had a few network points connected to an old BT panel shown in the top right of the picture.

Cat5 Installation DuringAbove and below show the wiring as existed before and during the network installation.

Cat5e Before Network Installation

 

New Wireless Network for Newport’s Hotel 55 Congratulations to our Technical Engineer Adam Smith on receiving the outstanding achievement award from Jobs Growth Wales! Cat5e, 6, 6a, 7, 7a or 8! What network do I choose right now? More Than Motorways: The Many Uses of ANPR Technology